• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

ADKO Engineering

  • Home
    • Bridge Design
    • Roadway Design
    • Construction Management
    • Independent Check
    • Cost Estimating
    • Environmental Services
  • About ADKO
  • New Technologies
  • Latest Posts
  • Careers
  • Contact us

Civil

January 4, 2020 by Majdi Kanaan

On-Call Engineering for Napa, CA

ADKO Engineering, Inc. is currently providing on-call/as-needed design, staff augmentation, construction inspection, and construction support services for various County FEMA, HBP, PBMP and Capital Improvement Program projects.

Current project assignments include:

  • Greenwood Avenue Bridge
  • Oakville Cross Road Bridge
  • Devlin Road Extension Project
  • Third Avenue Culvert Earthquake Repair
  • Manley Lane Culvert Replacement
  • Ridgecrest Drive Roadway Restoration
  • Sunnyhill Drive Roadway Restoration
  • Brookside Drive Over Conn Creek Storm Damage Repair

Construction Value: $15 Million
ADKO Fee: $2 Million
Client Reference: Mallika Ramachandran, PE

Manley Lane Roadway Reconstruction:

Filed Under: Civil, Roadway Rehabilitation, Roadway Restoration

January 4, 2020 by Majdi Kanaan

Devlin Road Extension Bridge

ADKO Engineering provided PS&E and construction management for the Devlin Seg E Project. Segment E project is approximately 1,100 feet in length, with a 92-foot single span precast prestressed CA Wide Flange Girder Bridge crossing Fagan Creek. The 1,000 feet roadway is supported on TDA. The bridge has three lanes, one northbound, one southbound and a center two-way left turn lane, totaling 40 feet (or 12-foot-wide lanes and 2-foot shoulder), 6 ½ foot curb, gutter and sidewalk both on the east and west sides, and 10 foot wide Class I multi-use path for pedestrian and bicycle traffic on the east side. The project includes bio retention (Water Quality) facilities, storm, sewer, recycled water and water facilities and includes, demolition of two existing buildings (hazardous material abatement on one of the buildings) and other auxiliary work.

Filed Under: Bridges, Civil

Primary Sidebar

Recent Posts

  • GALENA CREEK BRIDGE AND YERBA BUENA ISLAND VIADUCT
  • Ferguson Slide Rock Shed, Caltrans/AECOM, CA
  • SANTA FE AVE BRIDGE REPLACEMENT
  • OC 405 Widening Project, Orange County, CA
  • 2017 Earthquake Repairs County of Napa

Archives

  • January 2020

Categories

  • Bridges
  • Civil
  • Construction Management
  • Roadway Rehabilitation
  • Roadway Restoration
  • Structures

Footer

Pages

  • About ADKO
  • ADKO is looking
  • Careers
    • Bridge Engineer Needed
    • On-Call Engineer Needed
  • Contact us
    • Upload
  • Home
    • Bridge Design
    • Construction Management
    • Cost Estimating
    • Environmental Services
    • Independent Check
    • Roadway Design
  • Latest Posts
  • New Technologies

Recent Posts

  • GALENA CREEK BRIDGE AND YERBA BUENA ISLAND VIADUCT
  • Ferguson Slide Rock Shed, Caltrans/AECOM, CA
  • SANTA FE AVE BRIDGE REPLACEMENT
  • OC 405 Widening Project, Orange County, CA
  • 2017 Earthquake Repairs County of Napa

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org