ADKO Engineering provided PS&E and construction management for the Devlin Seg E Project. Segment E project is approximately 1,100 feet in length, with a 92-foot single span precast prestressed CA Wide Flange Girder Bridge crossing Fagan Creek. The 1,000 feet roadway is supported on TDA. The bridge has three lanes, one northbound, one southbound and a center two-way left turn lane, totaling 40 feet (or 12-foot-wide lanes and 2-foot shoulder), 6 ½ foot curb, gutter and sidewalk both on the east and west sides, and 10 foot wide Class I multi-use path for pedestrian and bicycle traffic on the east side. The project includes bio retention (Water Quality) facilities, storm, sewer, recycled water and water facilities and includes, demolition of two existing buildings (hazardous material abatement on one of the buildings) and other auxiliary work.