• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

ADKO Engineering

  • Home
    • Bridge Design
    • Roadway Design
    • Construction Management
    • Independent Check
    • Cost Estimating
    • Environmental Services
  • About ADKO
  • New Technologies
  • Latest Posts
  • Careers
  • Contact us

Independent Check

  1. Review seismic loading for the structure improvements and confirm the number of piles, reinforcement and member sizes.
  2. Review the structure improvements footing size, footing depth, footing embedment depth, rebar sizing and spacing, and reinforcement adequacy.
  3. Review rebar sizes and spacings.
  4. Review structure improvements dimensions.
  5. Check load combinations for dead load and access road live load.
  6. Review roadway layout and profile
  7. Review roadway cross sections

Primary Sidebar

Recent Posts

  • GALENA CREEK BRIDGE AND YERBA BUENA ISLAND VIADUCT
  • Ferguson Slide Rock Shed, Caltrans/AECOM, CA
  • SANTA FE AVE BRIDGE REPLACEMENT
  • OC 405 Widening Project, Orange County, CA
  • 2017 Earthquake Repairs County of Napa

Archives

  • January 2020

Categories

  • Bridges
  • Civil
  • Construction Management
  • Roadway Rehabilitation
  • Roadway Restoration
  • Structures

Footer

Pages

  • About ADKO
  • ADKO is looking
  • Careers
    • Bridge Engineer Needed
    • On-Call Engineer Needed
  • Contact us
    • Upload
  • Home
    • Bridge Design
    • Construction Management
    • Cost Estimating
    • Environmental Services
    • Independent Check
    • Roadway Design
  • Latest Posts
  • New Technologies

Recent Posts

  • GALENA CREEK BRIDGE AND YERBA BUENA ISLAND VIADUCT
  • Ferguson Slide Rock Shed, Caltrans/AECOM, CA
  • SANTA FE AVE BRIDGE REPLACEMENT
  • OC 405 Widening Project, Orange County, CA
  • 2017 Earthquake Repairs County of Napa

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org