ADKO Engineering, as a subconsultant to CC Myers, provided falsework design and shoring design for the Galena Creek Bridge and YBI Viaduct.
Construction Value: Varies
ADKO Fee: $800,000
Client Reference: Chris Nelson
by Majdi Kanaan
ADKO Engineering, as a subconsultant to CC Myers, provided falsework design and shoring design for the Galena Creek Bridge and YBI Viaduct.
Construction Value: Varies
ADKO Fee: $800,000
Client Reference: Chris Nelson


by Majdi Kanaan

Caltrans proposed to construct a new rock shed (Culvert) on Highway 140 between Mariposa and El Portal at Ferguson slide. The new rock shed Culvert will provide a safe and convenient access through a rock fall area due to a land slide movement. ADKO Engineering is conducting a peer review report that provides improvements and address safe rock shed construction, benefits, and concerns to allow the roadway to remain accessible in the event of further rockfalls that may occur due to slide movement above the shed area and be mindful of the high-water elevation and close proximity of the Merced River embankment on the lower side.
Role to Client:
Majdi Kanaan is the main point of contact to the Caltran’s and AECOM and served as an expert for engineering consulting services relating to this massive slide that required special experience with tunnels and culverts and slide stability. He planned, directed, and managed the budget and maintenance.
Construction Value: $15 Million
ADKO Fee: $25K | Duration: 2018
Client Reference: Melad Hanna, PE
by Majdi Kanaan
ADKO Engineering provided Myers & Sons with falsework, trestle and shoring design for Santa Fe Bridge over Tuolumne River, a 540 feet arched cast-in-place three span arched structure that is supported on 12-foot diameter CIDH Piles and 7 foot columns.
[su_youtube_advanced url=”https://www.youtube.com/watch?v=4xs8H1gcQFo” playlist=”” width=”600″ height=”400″ responsive=”yes” controls=”yes” autohide=”alt” autoplay=”no” mute=”no” loop=”no” rel=”no” fs=”yes” modestbranding=”no” theme=”dark” wmode=”” playsinline=”no” title=”” class=””]
by Majdi Kanaan




ADKO provided the independent design check services for the replacement of the existing eight overcrossings in Orange County. Our tasks involve identifying potential savings for the OC40 JV that totaled more than 50 Million. Project sites include:
— Talbert Ave OC Replacement is the largest structure on I-405 (434’ long) with 22 lanes totaling approximately 114’-0” in width. This two continuous spans CIP/PS box girder bridge is supported on a five-column and 24” driven steel pipe piles. A type selection report was provided on this structure. The challenges include the seismic analysis for liquefaction and lateral spreading.
— Slater Ave OC Replacement spans I-405 is 332’ long and 78’ wide structure. This two continuous spans CIP/PS box girder bridge is supported on a four-columns and 24” driven steel pipe piles. The challenges include the seismic analysis for liquefaction and lateral spreading.
— Harbor Blvd UC Undercrossing (Widening) spans I-405 is 203’ long and varies from 7’ to 19’ in width. This four continuous spans CIP/PS box girder bridge is supported on single column bents and class 200 piles. The challenges included retrofitting the existing 200’ wide structure. and retrofitting the existing structure.
— Santa Ana River Bridge (Widening) is 440’ long CA-I36 PC/PS Girder Bridge on both sides totaling 100’ variable width structure. The bridge is supported on pier walls and bin type wall abutments. The challenges include the seismic analysis for liquefaction and lateral spreading and retrofitting the existing structure.
— Heil Ave Pedestrian OC is comprised of three CIP/PS Box Girder (333’-6” long) spanning I-405 14 lanes and four level on-ramps at each end (1000’ long). The superstructure is supported on single 5’ columns and 96” CIDH Shafts. The challenges include the seismic analysis for liquefaction and lateral spreading.
Construction Value: $50 Million
ADKO Fee: $200,000
Client Reference: OC405 JV Partners, Mr. Azzam Saad
by Majdi Kanaan
ADKO is providing PS&E for the following earthquake damaged sites:

by Majdi Kanaan



ADKO Engineering provided preliminary engineering and PS&E for the Lewis Avenue Bridge, Structural Steel Truss Tied Arch in Atascadero. This aesthetically pleasing Tubular Steel Pipe Arch Truss Bridge in the City of Atascadero over Atascadero Creek. The bridge is approximately 164 feet long and 64 feet wide. The bridge’s concrete deck and structural members will be supported by suspension cables. This type of structure was used due to hydrology clearance which kept the deck thickness to a minimum. The project included advance planning studies, bridge PS&E, geotechnical investigation, environmental, surveying and mapping, hydraulic/scour evaluation, traffic control, roadway modifications, stage construction, utility relocations, drainage, public relations, right-of-way appraisals and acquisitions, and coordination with Caltrans and local agencies.
Construction Value: $5.5 Million
ADKO Fee: $250,000
Client Reference: Steve Khan